sitemap | Font size: default text size - Change text size to medium - Change text size to large
 
 
 
 
Water utilities

Water utilities and developers

Water distribution networks

Mains rehabilitation/renovation

Distribution networks may have deteriorated to the extent that they cause severe operational problems such as frequent bursts, low pressures and dirty water.

Hydraulic, structural and water quality surveys and data analysis can be conducted to assess the rehabilitation needs of the system.

Non-destructive and non-intrusive techniques as well as pipe sampling and laboratory assessment can be used.

Renovation programmes can be engineered and implemented by Halcrow and specific corrosion control methods identified.

 

 
Projects
 
Belize water services - water plan audit
Asset management planning
Customer billing and debt collection
Diesel storage pollution prevention
Flood risk assessments
Gortahork and Falcarragh Water Supply Scheme
Horton Kirby - Eynsford River Darent Low Flow Alleviation
Kent mains renovation programme
London leakage reduction
Municipality of Paralimni Cyprus proposed leakage & non revenue water reduction
RAF Lakenheath - Restore base water supply
Rapid distribution system assessment, continuous water supply strategy
Sandakan non revenue water leakage reduction
Water treatment works
Thames water optimisation study
Utility tariff study
Water distribution assessment and supply strategies
All mains model development
Water treatment works on four sites