|
Scope
To develop the existing road, including the culverts by strengthening, widening, up-grading and elevating it to the required levels, so making it suitable for vehicles related to drilling operations.
Construction of a new access road branching out of the existing road and meeting the drilling pad, with necessary cross drainage works, drilling pad and an elevated rig campsite area.
|