|
Assistance for a private developer in the implementation of a hydropower scheme in northern Luzon, including:
 |
hydrological and energy output analyses |
 |
preliminary design |
 |
bidding documents |
 |
"bankable" report for the preferred scheme |
Subsequently retained to prepare detailed designs for the 70MW, 535m gross head scheme, including intake weir, underground desander and a 10km tunnel.
|