Scope
The project consists of a bridge with a main span of 450 m and was designed by a Chinese domestic consultant. Halcrow was employed by the ADB to conduct an independent review to check the design, construction and contract management.
Key factors
 |
design review |
 |
cable-stayed bridge with 450 m main spa |
 |
approach viaducts |
 |
H shaped concrete pylons |
|