|
Halcrow was appointed to provide project management services, to review design and supervise construction of the world's largest moveable bridge. The bridge, constructed under a design and build contract, has a main span of 340m and provides a road and rail crossing over the Suez Canal.
key factors
- double swing bridge with a main span of 340m over the
Suez Canal.
- the bridge carries both road and rail traffic
- welded steel truss with a structural weight of 10,500t
on large rim bearings
- bridge crosses major navigation channel
- design and build
|