Phase 3 of the Great Man-Made River Project (GMRP) comprises two quite separate elements to supplement Phases 1 and 2.
scope
The scope of works for the Nippon Koei-Halcrow consortium comprises data collection and review, surveys (corrosion technology, materials, geotechnical, aerial, geomorphological, topographic), conceptual designs, preliminary designs, tender documents and tender evaluation.
key factors
 |
Wellfields (totalling 1.75 Mm3/d) |
 |
Pipelines 700km and 4m diameter |
 |
Pipelines 500km and 1.2m diameter |
 |
Header Tanks |
 |
Pumping Stations |
 |
Control Structures |
 |
Reservoirs |
 |
Mechanical systems |
 |
Electrical systems |
 |
ICA systems |
 |
Power supplies |
 |
Operations, Support and Maintenance Facilities |
 |
Project Extranet |
|