Halcrow have been commissioned by Salcon Engineering Bhd, which has a £5.7 million contract with Jabatan Air Sabah (JAS), to assist with the reduction of physical water losses by implementing leakage management techniques and carrying out a mains replacement programme for the town.
Details
Halcrow input to the project covers a two year period with expatriate staff resident in Malaysia for the duration.
Their work involves the following tasks:
 |
Design and set up of 20 District Meter Areas (DMA) |
 |
Building a network model to facilitate DMA design |
 |
Carrying out field tests to calibrate the model |
 |
Procurement of leakage detection equipment |
 |
Procurement of GIS and modelling software |
 |
Conversion of existing GIS data to new software |
 |