|
Tender design and detailed design for this 330MW hydropower project.
Providing innovative design at the tender stage to save 30% on conforming bid. Comprises 90m high RCC dam, 9m dia power tunnels, a 560m3/s power canal and surface power house with 4 vertical axis francis machines.
Feasibility review of left and right bank hydropower development, tender design of optimal layout, environmental review.
|