N11 Kilpedder Interchange - Tender Design for Clonmel Enterprises  
 

Halcrow.com projects

client:
..
Wicklow County Council
 
 
country:
..
Ireland
 
 
year:
..
2006
 
 

Scope:

Acted as designer to Irish contractor Clonmel Enterprises, for design and build tender for N11 Kilpedder Interchange Scheme which will provide a grade-separated junction between the existing N11 at Kilpedder and the Greystones Southern Access Route dual carriageway. It will replace and upgrade a temporary connection between the two roads, which is presently under construction. The scheme is 20 km south of Dublin.

The Scheme comprised:

4 slip ramps connecting to the N11
2 roundabouts and connection to one existing roundabout
a bridge spanning over 4 traffic lanes, footpaths and two-way cycle track under the existing N11 dual carriageway
a 4 lane Greystones Link Road of approximately 0.4km length between the two roundabouts on either edge of the N11
a 2 lane Western Link Road approximately 0.3km long with footpath and two-way cycle track
realignment of the N11 Southbound carriageway into the existing median over a length of 1.3km, with provision of a low working width safety barrier and a low retaining wall between the two carriageways
slight narrowing of the N11 Northbound carriageway to provide 3.5m wide traffic lanes instead of the existing 3.75m wide lanes
retaining walls approximately 250m long up to 7m high on either side of the Southbound diverge ramp
retaining walls approximately 150m long up to 5m high on either side of the Northbound diverge ramp
retaining wall approximately 150m long and up to 6m high between the eastern link road and the Southbound merge ramp
a footbridge at Kilpedder Village
pavement overlay and strengthening on the N11 dual carriageway over a length of 1.3km