Manila to Cavite Tolled Expressway  
 

Manila to Cavite Tolled Expressway

client:
..
Philippines Toll Regulatory Board, UEM-MARA Philippines Corporation
 
 
country:
..
Philippines
 
 
year:
..
1996 - 1998
 
 

The Manila-Cavite toll expressway is a £110 million project involving the construction of the following segments of expressway:

the R-1 Expressway: upgrading 6.6km of existing dual carriageway to dual three-lane expressway standard in a highly populated coastal area
the C-5 link Expressway: new construction of 6.0km of three-lane dual carriageway in a highly populated urban area
the R-1 Expressway Extension: new construction of 11.4km of two-lane dual carriageway, 5.0km of which was to be constructed on reclaimed land.

Using private finance, the project was designed, constructed, operated and maintained by a consortium consisting of the Public Estates Authority and UEM-MARA Philippines Corporation. With the agreement of the Philippines Toll Regulatory Board, this consortium appointed Halcrow to be the independent consulting engineer responsible for auditing, monitoring and certifying the design and construction processes.

The scope of works included:

certification of the total construction cost estimates
checking of the final engineering design
certification of land in vacant possession
evaluation of the proposed traffic management and rerouting plan during construction
periodic site inspections
certification of claims
certification of the operation and maintenance manual

verification of payments.