sitemap | Font size: default text size - Change text size to medium - Change text size to large
 
 
 
 
Back button. Return to previous page
 
Port Newark Container Yard Development  
 

Port Newark

client:
..
Port Newark Container Terminal
 
 
country:
..
USA
 
 
year:
..
2002-2003
 
 

Port Newark Container Terminal (PNCT) commissioned Halcrow to undertake project management, design and supervision consultancy services for the construction of a container yard on a 15 acre site as an extension to the development of their container terminal at Port Newark.

Halcrow was subsequently commissioned to undertake additional works consisting of the site supervision of the Phase 3 development and taking over the role of the Engineer of Record for the completion of on going construction project and design services for the West Area.

associated firms:

USEL - US Engineering Laboratories

key factors:

Project management
Project planning
Procurement of consents
environment-friendly landside and waterside port and infrastructure improvement plans and programmes
Preliminary and detailed design
Preparation of tender documents
Construction supervision for the container yard development
Preparation of As-Built drawings and certification
Phased construction to avoid disruption to terminal operations