Preveza Aktio Crossing  
 

Preveza Aktio Crossing

client:
..
Joint Venture of Christiani Nielsen and Technical Company of General Construction S.A. (T.C.G.C. S.A.), now EMPEDOS S.A.
 
 
country:
..
Greece
 
 
year:
..
1996-1997
 
 

Halcrow was commissioned to carry out a thermal analysis to simulate casting of precast concrete units for a 0.9km long immersed tube tunnel and to design measures to control early-age thermal cracking.

A link between Preveza and Aktio was to be formed across the Gulf of Amvrakikos in north-western Greece using a 0.9km immersed tube tunnel. A key requirement for the serviceability of the tunnel was the control of any early-age thermal cracking in order to prevent water ingress into the tunnel and deterioration of the 130m long reinforced concrete precast units.

Scope

To provide an 0.9km immersed tube tunnel across the gulf of Amvrakikos in north-western Greece.

Benefit to client

Thermal modelling provided measures against early-age thermal cracking including the design for an embedded cooling circuit.