 |
Preparation of design documentation and tender documentation for the areas of the Local Signalling Centres in Iława and in Malbork, the section from km 184,800 to km 287,700 ‘Modernization of railway line E65, section Warsaw - Gdynia, stage I in Poland |
 |
Preparation of design documentation for the construction of “Górna” route, the section from the crossing Jana Pawła II Ave. – Pabianicka St. to Rzgowska St. in Łódź |
 |
Verification of technical compliance of the design documentation with the Terms of Reference for the period of 2 years from the date of agreement execution for General Directorate for Motorways and Highways in Rzeszów |
 |
Preparation of documentation for the Cohesion Fund Application for the undertaking: “Improvement of water and waste-water management in the area of the Community Unions “Nidzica” and Nida 2000” |
 |
Preparation of documentation required for application for the Cohesion Fund co-financing for the project “The clean life - complex water and wastewater management in the Brwinów community area” |
 |
Feasibility Study “Improvement of railway access to the Port of Gdańsk” |
 |
Performance of the function of the Engineer for the project: “Water Supply and Waster Water Treatment Plant in Łódź II” |
 |
Performance of the function of the Engineer for the project “Water Supply, Sewerage System and Wastewater Treatment in Starachowice” |
 |
Performance of the function of the Engineer for modernization of railway line E-30, Section Węgliniec-Legnica |
 |
Contract Engineer Services for the Project ‘Water supply and Wastewater Treatment Plant in Łódź II’ No. 2004/PL/16/C/PE/010 |
 |
Providing services of the Engineer for the Project ‘Water supply, sewerage and wastewater treatment in Starachowice’ Contract No. 2004/PL/16/C/PE/020-01 |
 |
Engineer for modernization of railway line E-30, section Węgliniec-Legnica |
 |
Update of concept design of railway connection between planned terminals in Gdansk harbour and Gdansk harbour railway station |
 |
Construction of tram line to Chelm in Gdansk - detailed track design |